Bitmain Antminer S21 PRO 234 THBitmain Antminer S21 PRO 234 TH – USA
Bitmain Antminer S21 PRO 234 TH – USA: 234 TH/s for 3 550 W (15,18 J/TH efficiency ratio) thanks to air-cooled cooling. Buy your miner hosted directly in USA — 100% renewable energy at $0.075/kWh.
Your monthly revenue in BTC, live Bitcoin Core data
ROI calculated on the real ASIC price + live revenue. Configure on the side to see the precise monthly total with hosting and maintenance.
Live data
LIVEProven by history · average hashrate over 1 year
Review the details before confirming your order
Full summary: ASIC, USA hosting, maintenance, monthly operating fees. Adjust the quantity, confirm, and we take over.
Hosting calculation
Monthly consumption per ASIC = 3 550 W × 730 h ÷ 1,000 = 2,592 kWh / month.
Hosting cost = (consumption × kWh price + selected options) × ASIC qty.
Breakdown of the total to pay
ASIC (unit price × qty, paid in full) + security deposit (2 months) + 1st month prepayment. The monthly total includes hosting, electricity consumption and the selected options.
USA hosting included, everything is in the price
USA $0.075/kWh
Your hardware is hosted and operated in our dedicated datacenter — 100% renewable energy, Tier-2, 99.5%+ observed uptime, 95% contractual SLA (power and cooling, per contract). Learn more about the farm →
Turnkey ASIC + hosting,
transparent across the whole chain
You might also like
Questions fréquentes
New hardware comes with the Bitmain manufacturer warranty. Startmining additionally includes a maintenance & light repair plan of €9 / ASIC / month for first-level light maintenance, covering: diagnostics, reboots, firmware, settings, preventive maintenance, first-level on-site interventions and RMA coordination where applicable. Heavy repairs, major parts (hashboards, PSU, control boards, pumps, major components), manufacturer interventions and associated costs remain handled outside the plan, depending on the selected options. Updated: November 23, 2026
Not included: • hardware insurance, • heavy repairs, • major parts, • RMA, transport, customs and tax fees, • end-of-contract exit fees. Updated: November 23, 2026
The offer provides a 95% contractual SLA on site-side monthly availability, with prioritized energy; observed uptime on our sites is 99.5%+. This covers electrical availability and cooling on the site side, but not the individual uptime of each miner nor mining profitability. Updated: November 23, 2026
To lock in the order and the slot, the initial payments are: • the hardware price, paid in full, • the 1st month prepayment, • the security deposit, • and, where applicable, the installation / delivery fees shown at checkout. Updated: November 23, 2026
Yes. Exit operations, packing, handling, storage and shipping are invoiced separately according to the quote or the applicable price list. Updated: November 23, 2026

